Main

processing priority

4

site type

3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)

review version

11

html import

20 (imported)

Events

first seen date

2024-10-17 17:14:22

expired found date

-

created at

2024-10-17 17:14:22

updated at

2025-06-19 00:19:15

Domain name statistics

length

23

crc

10895

tld

2211

nm parts

0

nm random digits

0

nm rare letters

0

Connections

is subdomain of id

13642151 (wordpress.com)

previous id

0

replaced with id

0

related id

-

dns primary id

0

dns alternative id

0

lifecycle status

0 (unclassified, or currently active)

Subdomains and pages

deleted subdomains

0

page imported products

0

page imported random

0

page imported parking

0

Error counters

count skipped due to recent timeouts on the same server IP

0

count content received but rejected due to 11-799

0

count dns errors

0

count cert errors

0

count timeouts

0

count http 429

0

count http 404

0

count http 403

0

count http 5xx

0

next operation date

-

Server

server bits

server ip

-

Mainpage statistics

mp import status

20

mp rejected date

-

mp saved date

-

mp size orig

134422

mp size raw text

19773

mp inner links count

10

mp inner links status

10 (links queued, awaiting import)

Open Graph

title

Cumberland Soundings

description

Just another WordPress.com site

image

site name

Cumberland Soundings

author

updated

2026-02-24 07:32:49

raw text

Cumberland Soundings | Just another WordPress.com site Cumberland Soundings Just another WordPress.com site Skip to content Home About JED Silt Happens 2 Posted on October 18, 2013 by JED Silt indeed happens. Witness all the work taking place up in the northeast with dredges correcting (or attempting to do so) all the damage wrought by Hurricane SANDY. Our problems stem from silt being carried down The Sound and being deposited in some now expected areas. A survey discovers some unanticipated silting in St Mary’s River Entrance channel in this particular case so Great Lakes Dredge & Dock comes to the rescue. This was a win for everyone. Dredge ALASKA was transiting from a job in Louisiana to North Carolina, NAVY needed the dredge NOW and there was time in between jobs for ALASKA to respond. GLDD’s Dredge ALASKA Here are her particulars: Dimensions Length: 220 ft (67.1 m) Breadth: 56 ft (17.1 m) Depth: 12.5 ft (3.8 m) Overall Length: 312 ...

Text analysis

redirect type

0 (-)

block type

0 (no issues)

detected language

1 (English)

category id

Other [en] (231)

index version

2025123101

spam phrases

0

Text statistics

text nonlatin

0

text cyrillic

0

text characters

14607

text words

3354

text unique words

1142

text lines

548

text sentences

147

text paragraphs

45

text words per sentence

22

text matched phrases

1

text matched dictionaries

7

RSS

rss status

32 (unknown)

rss found date

2024-10-17 17:14:23

rss size orig

61638

rss items

7

rss spam phrases

0

rss detected language

1 (English)

inbefore feed id

-

inbefore status

0 (new)

Sitemap

sitemap status

40 (completed successful import of reports.txt file to table in_pages)

sitemap review version

2

sitemap urls count

9

sitemap urls adult

0

sitemap filtered products

0

sitemap filtered videos

0

sitemap found date

2024-10-17 17:14:22

sitemap process date

2024-10-17 17:14:23

sitemap first import date

-

sitemap last import date

2025-06-19 00:19:15