Main

processing priority

4

site type

3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)

review version

11

html import

20 (imported)

Events

first seen date

2024-09-20 09:02:43

expired found date

-

created at

2024-09-20 09:02:43

updated at

2025-12-30 09:04:36

Domain name statistics

length

19

crc

18469

tld

2211

nm parts

0

nm random digits

0

nm rare letters

0

Connections

is subdomain of id

69893241 (blogspot.com)

previous id

0

replaced with id

0

related id

-

dns primary id

0

dns alternative id

0

lifecycle status

0 (unclassified, or currently active)

Subdomains and pages

deleted subdomains

0

page imported products

0

page imported random

0

page imported parking

0

Error counters

count skipped due to recent timeouts on the same server IP

0

count content received but rejected due to 11-799

0

count dns errors

0

count cert errors

0

count timeouts

0

count http 429

0

count http 404

0

count http 403

0

count http 5xx

0

next operation date

-

Server

server bits

server ip

-

Mainpage statistics

mp import status

20

mp rejected date

-

mp saved date

-

mp size orig

82671

mp size raw text

7965

mp inner links count

69

mp inner links status

10 (links queued, awaiting import)

Open Graph

title

No to High Speed 2

description

image

site name

author

updated

2026-02-23 22:31:54

raw text

No to High Speed 2 26 Jan 2020 A good explanation of the case for HS2 Here is an excellent explanation of the case for HS2. The interesting point made is that the Great Central alignment has a maximum top speed of 110 mph without tilt. But the speaker does not explain whether the whole route is so curvy that it would be limited to 110 mph throughout, or, if there are a few points which are speed-limited, and which could be straightened or by-passed, which would be an obvious thing to do if the route is reinstated. The East Coast Main Line used to have sharp curves at Offord and Selby, but the former was straightened by realignment and the latter by constructing a cut-off route. The speaker also refers to the need to separate slow and fast trains. However, The West Coast Main Line is four track all the way from London to Crewe, apart from the short section between Roade and Rugby, where the slow lines are routed through Northampton. The East Coast Main Line is four tracks f...

Text analysis

redirect type

0 (-)

block type

0 (no issues)

detected language

1 (English)

category id

Podróże (51)

index version

1

spam phrases

0

Text statistics

text nonlatin

0

text cyrillic

0

text characters

6302

text words

1309

text unique words

493

text lines

118

text sentences

56

text paragraphs

18

text words per sentence

23

text matched phrases

0

text matched dictionaries

0

RSS

rss status

32 (unknown)

rss found date

2024-09-21 04:57:17

rss size orig

73938

rss items

25

rss spam phrases

0

rss detected language

1 (English)

inbefore feed id

-

inbefore status

0 (new)

Sitemap

sitemap status

40 (completed successful import of reports.txt file to table in_pages)

sitemap review version

2

sitemap urls count

268

sitemap urls adult

0

sitemap filtered products

0

sitemap filtered videos

0

sitemap found date

2024-09-21 03:35:46

sitemap process date

2024-09-21 03:35:48

sitemap first import date

-

sitemap last import date

2025-12-30 09:04:36