Main

processing priority

4

site type

3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)

review version

11

html import

20 (imported)

Events

first seen date

2024-09-20 01:24:29

expired found date

-

created at

2024-09-20 01:24:29

updated at

2026-01-19 21:55:09

Domain name statistics

length

29

crc

21915

tld

2211

nm parts

0

nm random digits

0

nm rare letters

0

Connections

is subdomain of id

69893241 (blogspot.com)

previous id

0

replaced with id

0

related id

-

dns primary id

0

dns alternative id

0

lifecycle status

0 (unclassified, or currently active)

Subdomains and pages

deleted subdomains

0

page imported products

0

page imported random

0

page imported parking

0

Error counters

count skipped due to recent timeouts on the same server IP

0

count content received but rejected due to 11-799

0

count dns errors

0

count cert errors

0

count timeouts

0

count http 429

0

count http 404

0

count http 403

0

count http 5xx

0

next operation date

-

Server

server bits

server ip

-

Mainpage statistics

mp import status

20

mp rejected date

-

mp saved date

-

mp size orig

126595

mp size raw text

14869

mp inner links count

30

mp inner links status

20 (imported)

Open Graph

title

SPLITFIREPOTTERY

description

Wood-fired pottery from my country home in Central New York.

image

site name

author

updated

2026-01-18 10:21:49

raw text

SPLITFIREPOTTERY SPLITFIREPOTTERY Wood-fired pottery from my country home in Central New York. Friday, August 31, 2012 KILN REBUILD I've been plugging away at the kiln site. I have had to stop to get more bricks, silica sand and Hawthorn 40 fire clay for the mortar, etc.  I do have some pictures of the latest progress I've made.    Gate from above. There will be removable grate bars for the whole door width front to back, I have the just the front half removed here. I will be able to just walk in to load the kiln.   Door arch is done.  First support...   Support frame ready for lath. Lath on and wall started. Fire box door frame with pavers.   Door arch and chamber arch in place. I'll cut and fill the gaps on each side, after. Super duty's on the inside and IFB's on the outside.   Walls going up, both sides at the same time. I've got angles to the pavers for iron framing to grab on. I have approx. a 5/8" gap between the wall and the chimney fille...

Text analysis

redirect type

0 (-)

block type

0 (no issues)

detected language

1 (English)

category id

Other [en] (231)

index version

2025123101

spam phrases

0

Text statistics

text nonlatin

0

text cyrillic

0

text characters

11219

text words

2652

text unique words

911

text lines

269

text sentences

158

text paragraphs

43

text words per sentence

16

text matched phrases

1

text matched dictionaries

2

RSS

rss status

32 (unknown)

rss found date

2024-11-04 21:46:23

rss size orig

299366

rss items

25

rss spam phrases

1

rss detected language

1 (English)

inbefore feed id

-

inbefore status

0 (new)

Sitemap

sitemap status

40 (completed successful import of reports.txt file to table in_pages)

sitemap review version

2

sitemap urls count

54

sitemap urls adult

0

sitemap filtered products

0

sitemap filtered videos

0

sitemap found date

2024-09-28 07:38:09

sitemap process date

2024-09-28 07:38:10

sitemap first import date

-

sitemap last import date

2025-12-30 11:44:12