id
related bits
0
processing priority
4
site type
3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)
review version
11
html import
20 (imported)
first seen date
2025-04-21 15:31:05
expired found date
-
created at
2025-04-21 15:31:05
updated at
2026-01-23 16:07:02
length
22
crc
1521
tld
2211
nm parts
0
nm random digits
0
nm rare letters
0
is subdomain of id
13642151 (wordpress.com)
previous id
0
replaced with id
0
related id
-
dns primary id
0
dns alternative id
0
lifecycle status
0 (unclassified, or currently active)
deleted subdomains
0
page imported products
0
page imported random
0
page imported parking
0
count skipped due to recent timeouts on the same server IP
0
count content received but rejected due to 11-799
0
count dns errors
0
count cert errors
0
count timeouts
0
count http 429
0
count http 404
0
count http 403
0
count http 5xx
0
next operation date
-
server bits
—
server ip
-
mp import status
20
mp rejected date
-
mp saved date
-
mp size orig
101908
mp size raw text
19619
mp inner links count
8
mp inner links status
20 (imported)
title
Catatan Yusranil
description
Rekam jejak hayalan dan ingatan
image
site name
Catatan Yusranil
author
updated
2026-01-21 19:49:29
raw text
Catatan Yusranil | Rekam jejak hayalan dan ingatan Catatan Yusranil Rekam jejak hayalan dan ingatan Mechanical Work Pada Project PLTU Posted in Steam Power Plant (PLTU) on April 10, 2008 by yusranil Secara umum, Pekerjaan/Peralatan Mekanikal pada suatu Project PLTU itu adalah sebagai berikut (ini hanya pengalaman pribadi saja): Boiler dan Auxiliary-nya, seperti Primary Fan, Secondary Fan, ID Fan, termasuk Auxiliary Boiler untuk start up. Steam Turbine dan Auxiliary-nya Condenser dan Feed water Heater. Jumlah dan Konfigurasi LP maupun HP Heaternya sangat tergantung dari desain dan kapasitas Power Plant itu sendiri. Dalam lingkup Pekerjaan/Peralatan ini, termasuk juga Deaerator. Water Plant System, mulai dari Desalination Plantnya, Demineralized (Water Treatment Plant), sampai sistem make up water untuk Boiler. Waste Water Treatment Plant Fire Protection System Compressed Air System, baik untuk Air service, maupun untuk Air Control Instrumentation. Chemical Fe...
redirect type
0 (-)
block type
0 (no issues)
detected language
126 (language undetectable (empty document, too short, or engines disagree))
category id
index version
2025123101
spam phrases
0
text nonlatin
0
text cyrillic
0
text characters
15986
text words
2639
text unique words
1012
text lines
239
text sentences
122
text paragraphs
52
text words per sentence
21
text matched phrases
1
text matched dictionaries
2
links self subdomains
0
links other subdomains
links other domains
6 - sasak.org, kompas.co.id, migas-indonesia.com, iktmesin-unram.net, unram.ac.id
links spam adult
0
links spam random
0
links spam expired
0
links ext activities
0
links ext ecommerce
0
links ext finance
0
links ext crypto
0
links ext booking
0
links ext news
0
links ext leaks
0
links ext ugc
32 - s0.wp.com, wp.me, s1.wp.com, wordpress.com, wordpress.org, lalumuhamadjaelani.wordpress.com, fahrurozi.wordpress.com
links ext klim
0
links ext generic
0
dol status
0
dol updated
2026-01-21 19:49:29
rss status
32 (unknown)
rss found date
2025-04-21 15:31:06
rss size orig
26171
rss items
4
rss spam phrases
0
rss detected language
126 (language undetectable (empty document, too short, or engines disagree))
inbefore feed id
-
inbefore status
0 (new)
sitemap path
sitemap status
40 (completed successful import of reports.txt file to table in_pages)
sitemap review version
2
sitemap urls count
5
sitemap urls adult
0
sitemap filtered products
0
sitemap filtered videos
0
sitemap found date
2025-04-21 15:31:05
sitemap process date
2025-12-01 11:15:38
sitemap first import date
-
sitemap last import date
2025-12-25 01:17:53