id
related bits
0
processing priority
4
site type
3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)
review version
11
html import
20 (imported)
first seen date
2024-11-19 17:07:48
expired found date
-
created at
2024-11-19 17:07:48
updated at
2026-01-19 22:17:33
length
25
crc
10938
tld
2211
nm parts
0
nm random digits
0
nm rare letters
0
is subdomain of id
69893241 (blogspot.com)
previous id
0
replaced with id
0
related id
-
dns primary id
0
dns alternative id
0
lifecycle status
0 (unclassified, or currently active)
deleted subdomains
0
page imported products
0
page imported random
0
page imported parking
0
count skipped due to recent timeouts on the same server IP
0
count content received but rejected due to 11-799
0
count dns errors
0
count cert errors
0
count timeouts
0
count http 429
0
count http 404
0
count http 403
0
count http 5xx
0
next operation date
-
server bits
—
server ip
-
mp import status
20
mp rejected date
-
mp saved date
-
mp size orig
150646
mp size raw text
15218
mp inner links count
66
mp inner links status
20 (imported)
title
Building the SP Los Angeles Division
description
image
site name
author
updated
2026-01-17 12:35:12
raw text
Building the SP Los Angeles Division Building the SP Los Angeles Division Monday, October 14, 2024 September Update September was a month of great progress. The light at the end of the tunnel is more than a flicker, and I'm pretty sure it isn't a headlight. Work happened all over the layout. The flow of this post will have overlaps as my goal is to represent the work done in a specific area versus a sequential representation of the work. I began actual construction of the 1 2/3 turn helix at the end of the Valley and Harbor staging yards. This will connect the staging yards to the Harbor spline and the yet to be constructed Valley spline. The engineered design of the helix is that each spiral is comprised of six 60 degree sections. Each shelf is a 1/8" masonite base layer. Three curved pieces of masonite are glued and pop riveted onto the base layer making a complete laminated shelf 1/4" thick. But only 1/8" is below the track making the effective shelf thickness only 1/8...
redirect type
0 (-)
block type
0 (no issues)
detected language
1 (English)
category id
Other [en] (231)
index version
2025123101
spam phrases
0
text nonlatin
0
text cyrillic
0
text characters
11960
text words
2683
text unique words
724
text lines
92
text sentences
206
text paragraphs
57
text words per sentence
13
text matched phrases
0
text matched dictionaries
0
links self subdomains
0
links other subdomains
0
links other domains
0
links spam adult
0
links spam random
0
links spam expired
0
links ext activities
0
links ext ecommerce
0
links ext finance
0
links ext crypto
0
links ext booking
0
links ext news
0
links ext leaks
0
links ext ugc
15 - blogger.com
links ext klim
0
links ext generic
0
dol status
0
dol updated
2026-01-17 12:35:12
rss status
32 (unknown)
rss found date
2024-11-19 17:07:52
rss size orig
1447453
rss items
25
rss spam phrases
1
rss detected language
1 (English)
inbefore feed id
-
inbefore status
0 (new)
sitemap path
sitemap status
40 (completed successful import of reports.txt file to table in_pages)
sitemap review version
2
sitemap urls count
87
sitemap urls adult
0
sitemap filtered products
0
sitemap filtered videos
0
sitemap found date
2024-11-19 17:07:48
sitemap process date
2025-03-24 09:47:38
sitemap first import date
-
sitemap last import date
2025-09-19 09:30:08