Main

related bits

0

processing priority

4

site type

3 (personal blog or private political site, e.g. Blogspot, Substack, also small blogs on own domains)

review version

11

html import

20 (imported)

Events

first seen date

2024-11-19 17:07:48

expired found date

-

created at

2024-11-19 17:07:48

updated at

2026-01-19 22:17:33

Domain name statistics

length

25

crc

10938

tld

2211

nm parts

0

nm random digits

0

nm rare letters

0

Connections

is subdomain of id

69893241 (blogspot.com)

previous id

0

replaced with id

0

related id

-

dns primary id

0

dns alternative id

0

lifecycle status

0 (unclassified, or currently active)

Subdomains and pages

deleted subdomains

0

page imported products

0

page imported random

0

page imported parking

0

Error counters

count skipped due to recent timeouts on the same server IP

0

count content received but rejected due to 11-799

0

count dns errors

0

count cert errors

0

count timeouts

0

count http 429

0

count http 404

0

count http 403

0

count http 5xx

0

next operation date

-

Server

server bits

server ip

-

Mainpage statistics

mp import status

20

mp rejected date

-

mp saved date

-

mp size orig

150646

mp size raw text

15218

mp inner links count

66

mp inner links status

20 (imported)

Open Graph

title

Building the SP Los Angeles Division

description

image

site name

author

updated

2026-01-17 12:35:12

raw text

Building the SP Los Angeles Division Building the SP Los Angeles Division Monday, October 14, 2024 September Update September was a month of great progress. The light at the end of the tunnel is more than a flicker, and I'm pretty sure it isn't a headlight. Work happened all over the layout. The flow of this post will have overlaps as my goal is to represent the work done in a specific area versus a sequential representation of the work.  I began actual construction of the 1 2/3 turn helix at the end of the Valley and Harbor staging yards. This will connect the staging yards to the Harbor spline and the yet to be constructed Valley spline.  The engineered design of the helix is that each spiral is comprised of six 60 degree sections. Each shelf is a 1/8" masonite base layer. Three curved pieces of masonite are glued and pop riveted onto the base layer making a complete laminated shelf 1/4" thick. But only 1/8" is below the track making the effective shelf thickness only 1/8...

Text analysis

redirect type

0 (-)

block type

0 (no issues)

detected language

1 (English)

category id

Other [en] (231)

index version

2025123101

spam phrases

0

Text statistics

text nonlatin

0

text cyrillic

0

text characters

11960

text words

2683

text unique words

724

text lines

92

text sentences

206

text paragraphs

57

text words per sentence

13

text matched phrases

0

text matched dictionaries

0

RSS

rss status

32 (unknown)

rss found date

2024-11-19 17:07:52

rss size orig

1447453

rss items

25

rss spam phrases

1

rss detected language

1 (English)

inbefore feed id

-

inbefore status

0 (new)

Sitemap

sitemap status

40 (completed successful import of reports.txt file to table in_pages)

sitemap review version

2

sitemap urls count

87

sitemap urls adult

0

sitemap filtered products

0

sitemap filtered videos

0

sitemap found date

2024-11-19 17:07:48

sitemap process date

2025-03-24 09:47:38

sitemap first import date

-

sitemap last import date

2025-09-19 09:30:08